Please register to save a watchlist.

Ships

Ship’s Register · No. 268

Le Bucentaure

Second Rate · 90-gun

Add to watchlist
161Battle Rating
Crew914min 640
Broadside90 guns24 · 32 · 32 · 2
Structure5,502internal HP
Side armor5,502per side HP
Bow armor2,751HP
Stern armor825HP
Sails12,710rigging HP
Hold1,550t20 slots
Hull mass3,839tons

The Timber

A hull is built from two woods — a framing timber for structure and armor, a planking timber for speed and crew. Choose a pair to see how it reshapes the hull above.

StatTeakframingTeakplankingCombined
Structure+3%+7.2%+10.2%
Thickness+6%+6%+12%
Speed+0.5%+0.5%
Crew Amount+1.5%+1.5%
Repair Armor+1.5%+1.5%
Armor Back+25%+25%
Holes Repair+5%+5%

Bill of Materials

MaterialQtyUnitCost
Framing Teak Log19,57810.00195,780
Planking Teak Log82010.008,200
Fir Log17,9484.0071,792
Stone Block4,8993.0014,697
Provisions crafted4,66037.08172,774
Sail Canvas crafted16,8981.8030,416
Iron Fittings crafted10,2592.1622,159
Ropes and Blocks crafted7,4599.0667,608
Doubloons crafted21,2100.102,121
Crafting fee0
Total build cost585,548reals